A successful creativity phase can generate a large number of ideas. This is followed by a task that is at least as important:
Which of these ideas should be pursued further?
A quick vote based on gut feeling is often not enough.
In a cross-functional team, solutions are viewed from different perspectives. What is technically interesting may require high investment. A low-cost solution may compromise customer requirements. An innovative idea may involve high risks or long development times.
Evaluation creates a shared basis for decisions.
Why ideas should not be discarded too early
At the outset, ideas are often still incomplete.
If feasibility, risks and costs are discussed immediately during the creativity phase, unusual approaches may be rejected too early.
In Value Analysis, idea generation and evaluation are therefore sensibly kept separate.
First, the solution space is opened up. Then proposals are worked out in more detail and assessed against suitable criteria.
Which criteria may be relevant?
The choice depends on the project.
Possible criteria include:
- fulfilment of customer requirements
- impact on relevant functions
- expected cost impact
- investment required
- technical feasibility
- development effort
- manufacturability
- Quality
- reliability
- impact on schedule
- Risk
- sustainability impact
- dependence on suppliers
- feasibility of implementation
Not every project needs all criteria.
What matters is to define, before the evaluation, which aspects are actually relevant to the specific decision.
From individual proposal to concept
Individual ideas are often not independent of one another.
A design change may, for example, only work if a manufacturing process is adapted or another component is changed at the same time.
The task is therefore not just to rank ideas.
An important step is concept development:
- Which ideas complement each other?
- Which are mutually exclusive?
- Which combination best meets the requirements?
- What dependencies exist?
- What effects are there on other areas?
Only such concepts can be compared reliably with the initial situation or with alternative concepts.
How comparable overall solutions are created from individual ideas is described in the article Concept Development in Value Analysis.
Evaluation creates transparency, not mathematical truth
Evaluation methods can structure decisions.
However, they do not replace professional responsibility.
A score is only as reliable as:
- the criteria used,
- their weighting,
- the underlying information
- and the quality of the assessments.
An evaluation should therefore document transparently why a concept is rated better or worse.
The weighted paired comparison, for example, is suitable for weighting the criteria.
Fully developed concepts can then be compared systematically using a utility analysis.
Evaluation in a cross-functional team
In Value Analysis projects in particular, it helps if the decision is not prepared by a single functional department.
R&D, procurement, production, quality, product management and other stakeholders contribute different information.
This allows conflicting objectives to become visible earlier.
Facilitation ensures that criteria and arguments are dealt with transparently and that decisions are not determined solely by hierarchy or by who speaks loudest.
VDI 2808 as a methodological basis
The VDI covers evaluation in Value Analysis in the VDI 2808 series of guidelines.
VDI 2808 Part 1 describes the procedure and tools; Part 2 contains application examples.
The guidelines apply evaluation to both products and processes.
Evaluation and economic decision
An initial methodical evaluation is often followed by a more detailed economic assessment.
This may include:
- expected manufacturing costs
- one-off expenses
- investments
- development effort
- cost-saving potential
- implementation time
- business case
In this way, methodical prioritisation becomes a concrete basis for the company’s decisions.
Further reading
- Detailed objectives and evaluation criteria
- Risk analysis in Value Analysis projects
- Creativity in Value Analysis and TRIZ
- The Value Analysis Work Plan in 10 steps
- Function Cost Analysis: allocating costs to functions
- Cost-benefit assessment and Value Index
- Implementation: turning ideas into effective actions
- Cost reduction project and cost reduction workshop
- Value Analysis project examples and references
- VDI 2808 Part 1 – Bewerten in der Wertanalyse (Evaluation in Value Analysis) (VDI)
- VDI 2808 Part 2 – Bewerten in der Wertanalyse, Beispiele (Evaluation in Value Analysis, Examples) (VDI)