After a creativity and concept phase, development and Value Analysis projects often produce several alternative solutions or design variants.
One solution may offer better technical performance, another may need less installation space, and a third may be easier to assemble. Which variant best meets the project objectives overall?
Utility analysis helps you compare different solutions systematically against several evaluation criteria.
What is a utility analysis?
Utility analysis is a scoring method for the systematic evaluation of several alternative solutions.
The procedure essentially consists of the following steps:
- Define the alternative solutions
- Determine the evaluation criteria
- Weight the evaluation criteria
- Determine the attribute values of the solutions
- Convert the attribute values into scores
- Calculate the weighted partial utility values
- Determine the total utility value of each solution
- Compare and check the results
Utility analysis therefore answers the question:
Which of the available alternative solutions best meets the weighted evaluation criteria overall?
In the approach described here, utility analysis is used for the technical evaluation of the alternative solutions. The economic evaluation is considered separately and can then be shown together with the technical rating in a strength diagram.
Define evaluation criteria
The first step is to define the criteria against which the solutions will be compared.
For a technical product, relevant criteria might include:
- technical performance
- installation space
- weight
- assembly effort
- ease of maintenance
- reliability
- development risk
- implementation time
Which criteria are used depends on the specific task and the project objectives.
The criteria should be as relevant, unambiguous and clearly distinct from one another as possible. In addition, the alternative solutions under consideration must be worked out in sufficient detail for their attribute values to be compared meaningfully.
Weighting the evaluation criteria with the paired comparison
Not every evaluation criterion is equally important.
The criteria are therefore weighted before the alternative solutions are evaluated.
A suitable method for this is the pairwise comparison, also known as paired comparison. The weighted or differentiated paired comparison additionally takes into account how much two criteria differ in importance.
Weighting factors gi for the utility analysis can be derived from the paired comparison.
For example:
| Evaluation criterion | Weight gi |
|---|---|
| Technical performance | 0,30 |
| installation space | 0,30 |
| Assembly time | 0,20 |
| development risk | 0,20 |
| Total | 1,00 |
The paired comparison answers the question:
How important are the individual evaluation criteria relative to one another?
The utility analysis then uses these weightings to compare the solutions.
Determine the attribute values of the solutions
Once the criteria have been defined and weighted, the attribute value of each alternative solution with respect to each criterion is determined.
This attribute value is denoted aij.
Here:
- i stands for the respective evaluation criterion,
- j stands for the respective alternative solution.
Examples of attribute values:
- technical performance: 95%
- installation space: 18 litres
- assembly time: 12 minutes
- development risk: low, medium or high
The attribute value initially describes the actual or expected characteristic of a solution.
Convert the attribute values into scores
The different attribute values cannot be offset against one another directly.
They are therefore then converted into scores wij.
A scale from 0 to 10 can be used for this, for example. A solution that meets a criterion very well receives a high score. Weaker fulfilment leads to a lower score.
For quantifiable criteria, rules defining which attribute value corresponds to which score should, wherever possible, be set before the actual evaluation.
For installation space, for example, the following could be defined:
- up to 14 litres = 10 points
- 15 litres = 9 points
- 16 litres = 8 points
- 18 litres = 7 points
- 20 litres = 5 points
This makes it clear how a score is derived from a specific attribute value.
Calculating partial utility values and the total utility value
The score wij of a solution is multiplied by the weighting gi of the respective criterion.
Partial utility value = wij · gi
The total utility value Nj of a solution is the sum of all weighted partial utility values:
Nj = ∑ gi · wij
A simplified example:
| Criterion | gi | Solution 1 ai1 | wi1 | wi1 · gi | Solution 2 ai2 | wi2 | wi2 · gi | Solution 3 ai3 | wi3 | wi3 · gi |
|---|---|---|---|---|---|---|---|---|---|---|
| Technical performance | 0,30 | 95 % | 9 | 2,70 | 85 % | 7 | 2,10 | 90 % | 8 | 2,40 |
| installation space | 0,30 | 18 l | 7 | 2,10 | 15 l | 9 | 2,70 | 16 l | 8 | 2,40 |
| Assembly time | 0,20 | 12 min | 7 | 1,40 | 10 min | 9 | 1,80 | 11 min | 8 | 1,60 |
| development risk | 0,20 | low | 9 | 1,80 | medium | 6 | 1,20 | medium | 6 | 1,20 |
| Total utility value Nj | 1,00 | 8,00 | 7,80 | 7,60 | ||||||
| Rank | 1 | 2 | 3 |
The key is a clear distinction:
Attribute value aij → score wij → weighted partial utility value wij · gi
This keeps it traceable which characteristic a solution has, how this characteristic was assessed and how much it influences the overall result.
Considering technical and economic evaluation separately
In Value Analysis and product development projects, it makes sense to consider the technical and economic evaluation separately at first.
In this approach, the utility analysis provides the technical rating, or technical utility value, of the solutions. The manufacturing costs, by contrast, are evaluated separately.
The technical and economic ratings can then be shown together in a strength diagram.
This shows which solutions are technically strong and economically attractive, and where trade-offs exist.
Critically reviewing the result
The highest total utility value should not automatically be equated with the right decision.
The evaluation depends on the criteria chosen, their weighting, the attribute values and the scores awarded.
The result should therefore be checked for plausibility.
If total utility values are similar, a sensitivity analysis can also be useful. It examines whether the ranking changes when individual weightings or scores are altered slightly.
Utility analysis in Value Analysis and Value Engineering
Within a Value Analysis or Value Engineering project, utility analysis is used when several sufficiently detailed alternative solutions need to be compared with one another.
In simplified form, the sequence can be shown as follows:
- developing solutions
- Define evaluation criteria
- Weight the criteria with the paired comparison
- Determine attribute values
- Award scores
- Calculate partial utility values
- Compare total utility values
- Determine the economic rating separately
- Compare technical and economic ratings
- prepare decision
The paired comparison and the utility analysis perform different tasks:
The paired comparison determines how important the evaluation criteria are.
The utility analysis shows which alternative solution best meets these weighted criteria technically overall.