Cost engineering models can output results down to individual euros or cents.
This precision of presentation must not be confused with actual certainty.
A cost model is based on input variables and assumptions.
Examples:
- material price
- material utilisation
- cycle time
- machine hourly rate
- labour costs
- scrap
- tool life
- production volume
If these values change, the result changes too.
Document data sources
For important input variables, it should be clear:
- which source they come from
- which point in time they relate to
- whether they are real actual values or assumptions
- which region or quantity they apply to
This keeps the model verifiable.
Make assumptions visible
Uncertainty is not automatically a problem.
The real problem is invisible uncertainty.
If a cycle time has been estimated, for example, this should be indicated.
The team can then check specifically later whether this assumption is relevant to the decision.
Consider sensitivity
Not every input variable influences the result to the same extent.
A sensitivity analysis can help to find out:
Which assumptions change the result most significantly?
Data collection should concentrate on these variables.
Ranges instead of spurious precision
In early development phases, exact information is often not available.
A range can then be more meaningful than a seemingly precise single value.
For example, a solution can initially be classified as:
- low cost range
- expected range
- upper cost range
and discussed on that basis.
The specific form of presentation should match the company's decision-making process.
Using cost models for decisions
The aim of a model is not to be as complicated as possible.
It is meant to support decisions.
Examples:
- compare technical concepts
- check the plausibility of supplier quotations
- make cost drivers visible
- check target costs
- prepare the Business Case
Link to Value Analysis
Value Analysis requires sufficiently reliable economic information.
At the same time, a project should not wait for perfect data if robust lines of enquiry are already apparent.
The art lies in achieving the accuracy required for the particular decision.
