The most expensive item is not automatically the most important cost driver

Technical content by Dr.-Ing. Jörg Marchthaler, Value Coaching Marchthaler

A product often has a few particularly large cost items.

However, this does not automatically mean that this is where the greatest improvement potential lies.

A cost driver is a cause or influencing factor that has a significant effect on costs.

Examples may include:

  • high material usage
  • complex geometry
  • tight tolerances
  • many machining steps
  • low volumes
  • high scrap
  • complex assembly
  • special parts
  • high product variety
  • special inspection requirements

Distinguishing between cost items and cost drivers

An expensive component is a cost item.

Only analysis shows why it is expensive.

Example:

A housing can generate high costs because:

  • a lot of material is used
  • machining time is high
  • tolerances are tight
  • the surface finish is complex
  • volumes are low

These causes open up completely different solution paths.

Making technical causes visible

Cost Engineering helps to trace costs back to technical influencing factors.

Value Analysis adds the question:

Why do we need this technical solution – or which function does it perform?

This avoids merely making the existing process slightly cheaper.

Cost drivers along the value chain

Cost drivers can be found at different points:

Product design

  • choice of material
  • geometry
  • number of components
  • tolerances
  • variants

Procurement

  • special parts
  • low volumes
  • supplier structure
  • materials market

Manufacturing

  • machine time
  • set-up effort
  • scrap
  • rework

Assembly

  • many joining operations
  • poor accessibility
  • high proportion of manual work

Prioritise instead of tackling everything

A project should not attempt to tackle every identified cost driver at the same time.

Drivers that are particularly relevant are those that:

  • offer significant cost leverage
  • can be influenced technically
  • can be addressed within the project timeframe
  • are not determined by unchangeable constraints

This is where Cost Engineering links up with Project Potential Assessment and Value Analysis.

Further reading

We Use Cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us improve this website and the user experience (tracking cookies). You can decide for yourself whether to allow cookies. Please note that if you decline, some features of the site may no longer be available.