With a series product, many decisions have already been made.
This can make change more difficult.
At the same time, the company has a major advantage:
Real experience is available.
This may include:
- actual manufacturing costs
- supplier prices
- production data
- quality problems
- service experience
- customer feedback
- competitor information
This data provides a reliable basis for a Value Analysis project.
Why conventional cost-down measures eventually reach their limits
Many companies continuously optimise existing products.
Typical measures:
- price negotiations
- material substitution
- process improvements
- changing suppliers
- automation
These approaches remain important.
Once they have largely been exhausted, a higher level of abstraction may be needed.
Instead of only asking:
“How can the existing component be made cheaper?”
the question from a Value Analysis perspective is:
“Which function has to be performed – and is there a fundamentally different solution?”
Real-world use as a source of knowledge
A series product shows which functions are actually relevant in practice.
Customer feedback can, for example, provide indications of:
- particularly valued features
- rarely used functions
- quality problems
- excess functionality
- new requirements
This information should feed into the analysis.
Function costs reveal cost focal points
The existing cost structure can be viewed in a new light through Function Cost Analysis.
Instead of examining component costs alone, costs are allocated to functions.
This can lead to different opportunity areas.
Changes must be evaluated economically
With existing products, changes often generate additional effort.
Examples:
- new tools
- validation
- changes to documentation
- remaining stock
- production changeover
- changing suppliers
- approvals
The theoretical reduction in unit costs should therefore not be the only consideration.
Considering the product life cycle
An action may make technical sense but no longer pay off economically if the product's remaining life is short.
Conversely, a larger change can be attractive with high volumes and a long product life.
Value Analysis must therefore take the economic context of the product into account.
Existing product or new generation?
Sometimes a Value Analysis project shows that individual actions make sense in the current product, but that greater potential can only be realised in the next generation.
The analysis can then combine both horizons:
- short-term actions in the series product
- structural changes in the successor generation
Further reading
- Systematic product cost reduction
- Value Engineering in new product development
- Function Analysis: looking at tasks instead of components
- Function Cost Analysis: allocating costs to functions
- Implementation: turning ideas into effective actions
- Cost reduction project and cost reduction workshop
- Project Potential Assessment: selecting the right projects